• No Scaling, can withstand Higher'Ph' Values.
  • Good Chemical Resistance.
  • Leak Proof Joints.
  • Very Less Coefficient Of Friction.
  • Promotes hygiene by restricting bacterial growth.
Greenfit PPR Plumbing systems have superior characteristics to withstand working temperatures up to 95°c along with excellent chemical resistance as well as providing a definite solution to oxidation and calcification. Therefore PPR is an ideal material for hot & cold water plumbing systems in buildings & Industrial piping installation ensuring high quality performance.

Pipes

  • Monolayer Pipes (PN 20)

  • Triple Layer (PN 20)

  • Pipes (Black) (UV Resistance) (PN 20)

  • Monolayer Pipes (PN 16)

  • Triple Layer (PN 16)

  • Pipes (Black) (UV Resistance) (PN 16)

  • Monolayer Pipes (PN 10)

  • Triple Layer (PN 10)

  • Pipes (Black) (UV Resistance) (PN 10)

  • Pipes (Black) (3L-Thermex) (PN 20)

  • Pipes (Black) (3L-Thermex) (PN 16)

  • Pipes (3L-Thermex) (PN 10)

Fittings

Brass Insert

Fittings

  • coupler ppr pipe fitting

    Coupler

  • elbow 90 ppr pipe fitting

    Elbow 90°

  • elbow 45 ppr pipe fitting

    Elbow 45°

  • equal tee ppr pipe fitting

    Equal Tee

  • plain union ppr pipe fitting

    Plain Union

  • end cap ppr pipe fitting

    End Cap

  • four way tee ppr pipe fitting

    Four way Tee

  • end plug ppr pipe fitting

    End Plug

  • extended end plug ppr pipe fitting

    Extended End Plug

  • pipe clamp ppr pipe fitting

    Pipe Clamp

  • flange core ppr pipe fitting

    Flange Core

  • flange ppr pipe fitting

    Flange

  • cross over ppr pipe fitting

    Cross Over

  • tank l ppr pipe fitting

    Tank Connector (Long)

  • tank s ppr pipe fitting

    Tank Connector (Short)

  • reducer ppr pipe fitting

    Reducer

  • reducing elbow ppr pipe fitting

    Reducing Elbow

  • reducing tee ppr pipe fitting

    Reducing Tee

  • gate valve ppr pipe fitting

    Gate Valve

  • ball valve ppr pipe fitting

    Ball Valve (Cold water)

Accessories

Specifications

Jointing Method

Process: Solvent Joint
DO'S
  • CUTTING

    Cut the pipe at a right angle to its axis using burr-free cutter.
    Ensure that the pipe is free from burrs or cutting chips.
    Clean the pipe & fitting perfectly before welding.
    Mark welding depth at the end of pipe.

  • HEATING

    Mount the suitable dyes on the heating element of the welding machine according tothe diameter of pipe and fitting.
    Connect the welding machine to 220 volts A.C. power supply.
    Select 2600C temperature on the welding machine thermostat.
    Wait until the required working temperature is reached.
    Insert the pipe and the fitting in the dyes by exerting light pressure.

  • WELDING

    After heating, quickly insert the pipe into the fitting by exerting light pressure.
    Any misalignment should be corrected immediately after insertion to avoid any stress in the weld.
    Allow the joint to cool as per the cooling time given in table.

  • STORAGE

    Although Greenfit PP-R Pipe system material is stabilized for use at elevated temperatures do not expose the pipes & fittings to direct sunlight.

  • TRANSPORTATION

    During transportation, Greenfit PP-R pipes should be loaded in a proper manner, otherwise pipes may get deformed.

  • PREPARATION FOR WELDING

    Before welding/jointing, clean the surface of Greenfit PP-R Pipes & Fittings with a clean piece of cloth and then start welding.

  • WELDING

    Avoid air droughts during welding to avoid stress in the welds.

  • SAFE WELDING

    Do not cool welding machine in water.

  • BENDING

    Do not apply direct flame to fabricate bends or crossover pipes, as the direct exposure to fire may cause damage to the Greenfit PP-R pipes. Use only hot air blowing equipment at 1400C. (Cross overs are readily available.)

  • INSTALLATION AT LOWER TEMPERATURE

    At sub zero temperatures (00C & below) Greenfit PP-R Pipe system tends to break under impact. Therefore, installation at low temperatures should be done with care, and the pipe lines shall be insulated.

DONT'S
  • CUTTING

    Do not cut slant/unevenly.

  • DEBURRING AND RIDGE REMOVAL

    Do not proceed with installation of pipe without deburring as the burr when heated will create an extra blockage inside the pipe.

  • CLEANING & MARKING

    Do not proceed without cleaning as it will create problems during welding due to the presence of dirt or mud.

  • WELDING JOINT

    1) Do not set the temperature of the heater higher or lower than 260°C.
    2) Do not initiate the jointing process without gloves.
    3) Misalignment of jointing to be corrected immediately before cooling, so as to avoid stress in the weld.

  • STORAGE

    Greenfit PP-R Pipe storage height should not be more than 1.5 meter.

  • HANDLING

    The Greenfit PP-R Pipe system should be protected from impact of hard and sharp objects.

  • HEATING

    While welding of Greenfit PP-R Pipes and fittings check that the thermostat of welding machine and dyes have reached correct temperature (2600C). While welding, the pipe must not be twisted.

  • SAFE WELDING

    Welding machines shall be earthed properly during use.

  • THREAD JOINT

    Do not over tighten threaded fittings & valves.

  • BENDING

    While bending the pipe, the bending radius shall be more than 8 times the diameter of the pipe.

  • OUTDOOR INSTALLATION

    Use 3 layered pipes for outdoor application.